|
Information on Finnish nuclear power plant Olkiluoto 3 which is scheduled to start operation in 2009
|
05-14-2007
|
2,004
|
Download
File Size 837.6kB
|
|
PCTRAN is a PC-based nuclear power plant simulator package for all types of light water nuclear reactors. Plant types include PWR, BWR and advanced designs in construction or planning. Operating in the...
|
05-30-2007
|
1,096
|
Download
File Size 246.7kB
|
|
Areva's Nuclear Services Overview
|
05-14-2007
|
1,078
|
Download
File Size 2.8MB
|
|
The primary driver for pressurizer replacement is a plant's desire to reduce or eliminate downtime due to pressurizer heater sleeve leaks or other Alloy 600 leaks that have plagued the industry for some...
|
05-08-2007
|
859
|
Download
File Size 38.2kB
|
|
Security of energy supply and energy cost stability in the long term, plus the efforts to combat the greenhouse effect and potential global warming, argue in favor of a greater diversity in sources of...
|
05-14-2007
|
673
|
Download
File Size 2.6MB
|
|
In response to industry events involving Alloy 600 material in reactor vessel closure head (RVCH) penetrations, a number of pressurized water reactor (PWR) utilities have, or intend to, replace the RVCH...
|
05-08-2007
|
669
|
Download
File Size 40.7kB
|
|
FRAMATOME ANP’s evaluations indicated that identified modern modular HTRs are a promising concept to meet the requirements of enhanced safety, higher efficiency, competitiveness and waste management. Evaluations...
|
05-14-2007
|
658
|
Download
File Size 787.9kB
|
|
Pressurized water reactor (PWR) plants have experienced primary water stress corrosion cracking (PWSCC) since the 1980s. PWSCC occurs in Alloy 82/182 welds as well as Alloy 600 components. Left untreated...
|
05-08-2007
|
651
|
Download
File Size 507kB
|
|
Technology, Schedule, and Cost Certainty The Advanced Boiling Water Reactor (ABWR) is the foundation of GE’s nuclear reactor portfolio. The Gen III design is available today to meet generation needs, from...
|
05-14-2007
|
604
|
Download
File Size 239.6kB
|
|
Primary water stress corrosion cracking (PWSCC) of Alloy 600 materials and Alloy 182/82 welds has become a top industry concern for PWR plants. PWSCC has produced significant availability losses and has...
|
05-08-2007
|
557
|
Download
File Size 211.4kB
|