in

Plant Technical Articles

Most Downloads

File Date Added Downloads  
This is a Bechtel brochure that talks about their experience with steam generator replacement projects.
07-12-2007 1,155 Download
File Size 271.7kB
This article talks about the successful steam generator replacement project at Calvert Cliffs done by SGT LTD.
07-12-2007 545 Download
File Size 486.7kB
Replacing the Steam Generators at SONGS is planned for 2009–2010, at a cost of $680 million, involves massive challenges, beginning with moving the generators to and from the plant. The new steam generators...
07-12-2007 507 Download
File Size 188.1kB
Exelon submitted its modern, 3D analysis of Oyster Creek's drywell shell to the U.S. Nuclear Regulatory Commission. The results of that analysis confirms that the thickness of the drywell shell meets...
01-26-2009 139 Download
File Size 34kB
The section describes the stress analyses of the Oyster Creek Drywell under different loading conditions using the finite element model.
01-26-2009 122 Download
File Size 4.4MB
This summary report presents the results of the finite element structural analysis of the primary containment drywell shell at the Oyster Creek Nuclear Generating Station (Oyster Creek). This structural...
01-26-2009 114 Download
File Size 3.7MB
This summary report presents the analysis and results of the structural analysis sensitivity study of the Oyster Creek Nuclear Generating Station (Oyster Creek) primary containment drywell shell. Reference...
01-26-2009 101 Download
File Size 5MB
Copyright (c) 2010 Nuclear Street
Advertise With Us | Terms and Conditions | Privacy | Copyright | Contact Us