in

ALARA Solutions

Most Downloads

File Date Added Downloads  
A 2006 presentation of Radiation Safety in the Design of a Finnish Nuclear Power Plant
07-27-2007 328 Download
File Size 294.9kB
This 5-year plan summarizes the existing programs for dose reduction. It also outlines future exposure reduction initiatives necessary to achieve first quartile dose performance.
05-14-2007 201 Download
File Size 465.1kB
The Farley Unit 1 SGR was completed in May of 2000 and an ALARA / Health Physics report was generated that provided outage statistics, information on outage planning, outage implementation, and lessons...
05-14-2007 199 Download
File Size 606.9kB
This report covers the radiation exposure history at Seabrook Station from entry into Cycle 7 power generation through the completion of Refueling Outage 7 (including the outage extension for repairs to...
05-14-2007 193 Download
File Size 511.6kB
In 1993 Entergy Operations decided ANO Unit 2 steam generators required replacement due to tube degradation. The Steam Generator Replacement Project (SGRP) team was formed to prepare for a major construction...
05-14-2007 186 Download
File Size 5.1MB
A 2006 presentation of the operational experience at Olkiluoto Nuclear Power Plant
07-27-2007 181 Download
File Size 3.7MB
A 2006 presentation on Browns Ferry Unit 1 Recovery Dose and Source Term Reduction Initiatives
07-27-2007 176 Download
File Size 1.2MB
A presentation on Occupational Exposure at Japanese Nuclear Power Plants in 2004
07-27-2007 159 Download
File Size 405.9kB
A presentation on Beaver Valley's 2005 ALARA Plan and Dose Goals
07-27-2007 137 Download
File Size 372.7kB
A 2006 presentation on the Spanish Nuclear Power Plants 2005 Accumulated Dose
07-27-2007 131 Download
File Size 510.1kB
More Posts Next page »
Copyright (c) 2008 Nuclear Street
Terms and Conditions | Privacy | Copyright