|
A 2006 presentation of Radiation Safety in the Design of a Finnish Nuclear Power Plant
|
07-27-2007
|
1,142
|
Download
File Size 294.9kB
|
|
Contemporary management at U. S. nuclear power plants compels us to reduce costs through continuous examination of those processes that impede maximizing the economic operation of the station. Outage duration...
|
07-27-2007
|
720
|
Download
File Size 71.8kB
|
|
A 2006 presentation on Browns Ferry Unit 1 Recovery Dose and Source Term Reduction Initiatives
|
07-27-2007
|
554
|
Download
File Size 1.2MB
|
|
This 5-year plan summarizes the existing programs for dose reduction. It also outlines future exposure reduction initiatives necessary to achieve first quartile dose performance.
|
05-14-2007
|
398
|
Download
File Size 465.1kB
|
|
The Farley Unit 1 SGR was completed in May of 2000 and an ALARA / Health Physics report was generated that provided outage statistics, information on outage planning, outage implementation, and lessons...
|
05-14-2007
|
394
|
Download
File Size 606.9kB
|
|
This report covers the radiation exposure history at Seabrook Station from entry into Cycle 7 power generation through the completion of Refueling Outage 7 (including the outage extension for repairs to...
|
05-14-2007
|
367
|
Download
File Size 511.6kB
|
|
In 1993 Entergy Operations decided ANO Unit 2 steam generators required replacement due to tube degradation. The Steam Generator Replacement Project (SGRP) team was formed to prepare for a major construction...
|
05-14-2007
|
367
|
Download
File Size 5.1MB
|
|
A presentation on Occupational Exposure at Japanese Nuclear Power Plants in 2004
|
07-27-2007
|
367
|
Download
File Size 405.9kB
|
|
A 2006 presentation of the operational experience at Olkiluoto Nuclear Power Plant
|
07-27-2007
|
350
|
Download
File Size 3.7MB
|
|
A presentation on Beaver Valley's 2005 ALARA Plan and Dose Goals
|
07-27-2007
|
321
|
Download
File Size 372.7kB
|