Skip Navigation
Skip Navigation
NRC Seal
Index | Site Map | FAQ | Help | Glossary | Contact Us         Advanced Search

Home Who We Are What We Do Nuclear Reactors Nuclear Materials Radioactive Waste Facility Info Finder Public Involvement Electronic Reading Room

 

GE-Hitachi Nuclear Energy - Submittal of ESBWR Standard Plant Design - Revision 4 to Design Control Document - Tier 1 and Tier 2.

This package contains 57 documents.

Previous Page

Document File

Title  Accession Number  Document Date  Estimated Page Count 
View Document   1. GE-Hitachi Nuclear Energy - Submittal of ESBWR Standard Plant Design - Revision 4 to Design Control Document - Tier 1 and Tier 2. ML072900510 2007-09-28 3
 
View Document   2. 26A6641AB, Rev. 4, "ESBWR Standard Plant Design", Tier 1, Changes From Revision 3 to Revision 4. ML072900518 2007-09-28 60
 
View Document   3. 26A6641AB, Rev. 4, "ESBWR Standard Plant Design", Tier 1. ML072900519 2007-09-28 570
 
View Document   4. 26A6642AB, Rev. 4, "ESBWR Design Control Document", Tier 2, Table of Contents Revision 1 to Revision 4 Change List. ML072900527 2007-09-28 1
 
View Document   5. 26A6642AB, Rev. 4, "ESBWR Design Control Document", Tier 2, Table of Contents. ML072900530 2007-09-28 178
 
View Document   6. 26A6642AD, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 1 - Introduction and General Description of Plant, Revision 3 to Revision 4 Change List. ML072900534 2007-09-28 36
 
View Document   7. 26A6642AD, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 1, Introduction and General Description of Plant, Sections 1.1 - 1.11. ML072900543 2007-09-28 397
 
View Document   8. 26A6642AF, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 1, Introduction and General Description of Plant, Appendices 1A-1D. ML072900548 2007-09-28 79
 
View Document   9. 26A6642AF, Rev. 4, "ESBWR Design Control Document", Appendices 1A to 1D, Revision 3 to Revision 4 Change List. ML072900551 2007-09-28 15
 
View Document   10. 26A6642AH, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 2, Site Characteristics. ML072900558 2007-09-28 23
 
View Document   11. 26A6642AH, Rev. 4, "ESBWR Design Control Document", Chapter 2, Revision 3 to Revision 4 Change List. ML072900567 2007-09-28 7
 
View Document   12. 26A6642AJ, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 3, Design of Structures, Components, Equipment, and Systems, Sections 3.1 - 3.8. ML072900576 2007-09-28 312
 
View Document   13. 26A6642AJ, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 3 Revision 3 to Revision 4 Change List, (Sections 3.1 to 3.8). ML072900585 2007-09-28 31
 
View Document   14. 26A6642AK, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 3 Revision 3 to Revision 4 Change List, (Sections 3.9 to 3.11). ML072900590 2007-09-28 14
 
View Document   15. 26A6642AK, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 3, Design of Structures, Components, Equipment, and Systems, Sections 3.9 - 3.11. ML072900608 2007-09-28 154
 
View Document   16. 26A6642AL, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 3 Revision 3 to Revision 4 Change List, (Appendices 3A - 3F). ML072900610 2007-09-28 15
 
View Document   17. 26A6642AL, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 3, Design of Structures, Components, Equipment, and Systems, Appendices 3A - 3F. ML072900612 2007-09-28 271
 
View Document   18. 26A6642AN, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 3, Revision 3 to Revision 4 Change List, (Appendices 3G - 3L). ML072900618 2007-09-28 23
 
View Document   19. 26A6642AN, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 3, Design of Structures, Components, Equipment, and Systems, Appendices 3G - 3L. ML072900619 2007-09-28 409
 
View Document   20. 26A6642AP, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 4, Changes From Revision 3 to Revision 4. ML072900628 2007-09-28 14
 
View Document   21. 26A6642AP, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 4, Reactor. ML072900630 2007-09-28 275
 
View Document   22. 26A6642AR, Rev 4, "ESBWR Design Control Document", Tier 2, Chapter 5, Reactor Coolant System and Connected Systems. ML072900632 2007-09-28 172
 
View Document   23. 26A6642AR, Rev. 4, "ESBWR Design Control Document," Tier 2, Chapter 5, Revision 3 to Revision 4 Change List. ML072900634 2007-09-28 16
 
View Document   24. 26A6642AT, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 6, Changes From Revision 3 to Revision 4. ML072900638 2007-09-28 18
 
View Document   25. 26A6642AT, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 6, Engineered Safety Features. ML072900643 2007-09-28 388
 
View Document   26. 26A6642AW, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 7, Changes From Revision 3 to Revision 4. ML072900646 2007-09-28 38
 
View Document   27. 26A6642AW, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 7, Instrumentation and Control Systems. ML072900648 2007-09-28 403
 
View Document   28. 26A6642AX, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 8, Revision 3 to Revision 4 Change List. ML072900651 2007-09-28 21
 
View Document   29. 26A6642AX, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 8, Electric Power. ML072900652 2007-09-28 77
 
View Document   30. 26A6642AY, Rev. 4, "ESBWR Design Control Document", Tier 2, APPENDIX 9A, Change List. ML072910035 2007-09-28 2
 
View Document   31. 26A6642AY, Rev. 4, "ESBWR Design Control Document", Tier 2, Section 9, Change List. ML072910039 2007-09-28 80
 
View Document   32. 26A6642AY, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 9, Auxiliary System. ML072910044 2007-09-28 317
 
View Document   33. 26A6642BB, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 9, Auxiliary Systems, Appendix 9A. ML072910046 2007-09-28 246
 
View Document   34. 26A6642BD, Rev. 4, "ESBWR Design Control Document", Tier 2, APPENDIX 9B, Change List. ML072910047 2007-09-28 3
 
View Document   35. 26A6642BD, Rev 4, "ESBWR Design Control Document", Tier 2, Chapter 9, Auxiliary Systems, Appendix 9B. ML072910051 2007-09-28 17
 
View Document   36. 26A6642BF, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 10, Changes From Revision 3 to Revision 4. ML072910052 2007-09-28 9
 
View Document   37. 26A6642BF, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 10, Steam and Power Conversion System. ML072910054 2007-09-28 89
 
View Document   38. 26A6642BH, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 11, Changes From Revision 3 to Revision 4. ML072910055 2007-09-28 11
 
View Document   39. 26A6642BH, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 11, Radioactive Waste Management. ML072910058 2007-09-28 131
 
View Document   40. 26A6642BJ, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 12 Changes From Revision 3 to Revision 4. ML072910065 2007-09-28 3
 
View Document   41. 26A6642BJ, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 12, Radiation Protection. ML072910070 2007-09-28 228
 
View Document   42. 26A6642BL, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 13, Changes From Revision 3 to Revision 4. ML072910071 2007-09-28 7
 
View Document   43. 26A6642BL, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 13, Conduct of Operations. ML072910074 2007-09-28 19
 
View Document   44. 26A6642BN, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 14 Revision 3 to Revision 4 Change List. ML072910076 2007-09-28 7
 
View Document   45. 26A6642BN, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 14, Initial Test Program. ML072910079 2007-09-28 125
 
View Document   46. 26A6642BP, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 15, Revision 3 to Revision 4 Change List. ML072910092 2007-09-28 15
 
View Document   47. 26A6642BP, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 15, Safety Analyses. ML072910095 2007-09-30 492
 
View Document   48. 26A6642BR, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 16, Changes From Revision 3 to Revision 4. ML072910097 2007-09-28 11
 
View Document   49. 26A6642BR, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 16, Technical Specifications. ML072910103 2007-09-30 256
 
View Document   50. 26A6642BT, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 16B Changes From Revision 3 to Revision 4. ML072910108 2007-09-28 22
 
View Document   51. 26A6642BT, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 16B, Bases. ML072910121 2007-09-30 506
 
View Document   52. 26A6642BW, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 17, Changes from Revision 3 to Revision 4. ML072910124 2007-09-28 3
 
View Document   53. 26A6642BW, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 17, Quality Assurance. ML072910125 2007-09-30 27
 
View Document   54. 26A6642BX, Rev. 4, "ESBWR Design Control Document', Tier 2, Chapter 18, Changes From Revision 3 to Revision 4. ML072910131 2007-09-28 13
 
View Document   55. 26A6642BX, Rev. 4, "ESBWR Design Control Document', Tier 2, Chapter 18, Human Factors Engineering. ML072910152 2007-09-30 63
 
View Document   56. 26A6642BY, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 19, Changes from Revision 3 to Revision 4 Change List. ML072910160 2007-09-28 6
 
View Document   57. 26A6642BY, Rev. 4, "ESBWR Design Control Document", Tier 2, Chapter 19, Probabilistic Risk Assessment and Severe Accidents. ML072910176 2007-09-30 231
 

Previous Page



Privacy Policy | Site Disclaimer