in

New Nuclear Plants: Browse by Tags

All Tags » GE-Hitachi Nuclear Energy
Page 1 of 1 (2 items)

Files in this Folder

File Date Added Downloads  
From the NRC Download Link is to the NRC page Design Documents: The Economic Simplified Boiling Water Reactor (ESBWR) is a 4500 MWt reactor that uses natural circulation for normal operation and has passive...
06-27-2008 266 Download
File Size 18.3kB
Proposed New Nuclear Power Plants details the proposed plant location, design type, application date to the NRC, and the company that has submitted the application. UPDATED: March 16, 2010
12-17-2008 12,445 Download
File Size 203.1kB
Page 1 of 1 (2 items)
Copyright (c) 2010 Nuclear Street
Advertise With Us | Terms and Conditions | Privacy | Copyright | Contact Us