in

Plant Reports: Browse by Tags

All Tags » RSG
Page 1 of 1 (2 items)

Files in this Folder

File Date Added Downloads  
In 1993 Entergy Operations decided ANO Unit 2 steam generators required replacement due to tube degradation. The Steam Generator Replacement Project (SGRP) team was formed to prepare for a major construction...
05-14-2007 209 Download
File Size 5.1MB
The Farley Unit 1 SGR was completed in May of 2000 and an ALARA / Health Physics report was generated that provided outage statistics, information on outage planning, outage implementation, and lessons...
05-14-2007 236 Download
File Size 606.9kB
Page 1 of 1 (2 items)
Copyright (c) 2008 Nuclear Street
Terms and Conditions | Privacy | Copyright