GE-Hitachi to Offer 300 MW SMR

Design work is underway to downsize the 1500 MW ESBWR to a 300 MW model to be called the BWRX300. As yet no date has been set for submitting it for design safety review at the NRC. GE-Hitachi (GEH) is focusing its design work on getting the cost of the reactor down from the levels associated with ...read more