Sign in
|
Join
Home
Plants
Business
Jobs
News
Blogs
Forums
Photos
Videos
Library
Videos
Nuclear Power Animation Series
Ads
Advertise Here!
Check out our Media Kit!
Follow Us On
Nuclear Power Animation Series:
General Nuclear Videos
– Shows 3D uranium atom fission to nuclear power steam generation and other interesting animations.
Reactor Defueling
- Demonstrates how a reactor is defueled.
Nuclear Fuel Dry Storage Process
– Demonstrates the activities associated with moving spent nuclear fuel using a Transfer Cask into a Dry Storage Area or Dry Storage Building.
General
Reactor Defueling
Loading Transfer Cask
Removing Transfer Cask
To Dry Storage
Nuclear Power Plant Fly By Animation
Aerial view of a plant showing the major structures.
1 of 3 videos in this series.
Nuclear Power Plant Fly By Animation
Aerial view of a plant showing the major structures.
2 of 3 videos in this series.
Nuclear Power Plant Fly By Animation
Aerial night view of a plant showing the major structures.
3 of 3 videos in this series.
Nuclear Steam Supply System - PWR
Demonstrates how the nuclear steam supply system generates steam in a pressurized water reactor (PWR).
Steam Turbine Operation
Displays steam turbine operation to generate electricity.
Uranium Fission
Uranium fission heats the water in the primary loop of the reactor.
Nuclear Fuel Pellet
3D Model of a Nuclear Fuel Pellet.
Nuclear Fuel Assembly
3D Model of a Nuclear Fuel Assembly.
Nuclear Fuel Removal - Reactor Head Lift
At the beginning of the refueling process, the RCS water level is maintained at flange level. The reactor head is removed and the reactor cavity is flooded for upper internals removal and defueling.
1 of 5 videos in this series.
Nuclear Fuel Removal - Remove Fuel to Upender
Fuel is removed from the reactor using the fuel handling crane and moved to the upender for transfer to the spent fuel pool.
2 of 5 videos in this series.
Nuclear Fuel Removal - Upender to Spent Fuel Pool
Fuel is transported by the upender and the fuel transfer cart to the spent fuel pool.
3 of 5 videos in this series.
Nuclear Fuel Removal - Spent Fuel Pool
Fuel is placed in the spent fuel rack for storage.
4 of 5 videos in this series.
Nuclear Fuel Removal - Spent Fuel Pool
Elevated view of the spent fuel pool with the fuel being place in the fuel rack.
5 of 5 videos in this series.
Dry Storage Canister(DCS) and Transfer Cask
Shows the assembly of the Dry Storage Canister and the Transfer Cask.
Transfer Cask moved into the Fuel Storage Building
A truck moves the Transfer Cask into the Fuel Storage Building.
Transfer Cask in the Fuel Storage Building
The Transfer Cask is moved into the truck bay of the Fuel Storage Building.
Transfer Cask is moved to the Cask Preparation Area
The Transfer Cask is moved to the Cask Preparation Area inside the Fuel Handling Building for loading.
Alternative Method - Cask moved directly to the Loading Pool
Alternative method of getting the Transfer Cask to the Loading Pool from outaside the Fuel Handling Building for the fuel transfer.
Dry Shielded Canister
The Dry Shielded Canister is loaded into the Transfer Cask.
Dry Shielded Canister and Transfer Cask
Water is pumped into the annulus area (between the canister and cask wall) and a o-ring is installed.
Location of cask Loading Pool
The location of the cask Loading Pool next to the Spent Fuel Pool. Some loading areas are located in the Spent Fuel Pool as shown on videos labeled as alternative method.
Transfer Cask moved to the Loading Pool
The assembled Transfer Cask is then moved to the Loading Pool.
Alternative Method - Transfer Cask Prepped Adjacent to the Loading Pool
Alternative method would be preparing the Transfer Cask in the Preparation Area that is external and adjacent to the Loading Pool.
Wetting the Transfer Cask
Wetting the the exterior surface of the cask for contamination control.
Alternative Method - Wetting the Transfer Cask
Moved from the external Preparation Area, the Transfer Cask's exterior surface is wetted for contamination control .
Spent Fuel Pool with Loading Area
Shows the alternative location of the loading area in the spent fuel pool.
Moving fuel from Spent Fuel Pool to Loading Pool
Moving spent nuclear fuel to the cask loading pool.
Moving fuel to the Transfer Cask
Moving fuel to the Transfer Cask in the Loading Pool.
Alternative Method - Moving fuel to the Transfer Cask
Elevated view of an alternative method for moving fuel to the Transfer Cask.
Alternative Method - Moving fuel to the Transfer Cask
From the external Preperation Area - Underwater view of moving fuel to the Transfer Cask.
Removing Transfer Cask from Loading Pool
A plug is installed on the Transfer Cask and the cask is removed from the loading pool.
Alternative Method - Removing Transfer Cask from Loading Pool
An alternative method for removing the Transfer Cask from the loading pool to the external Preparation Area.
Transfer Cask is moved back to the Preparation Area
The Transfer Cask is moved back to the Preparation Area.
Alternative Method - Cask is moved back to Preparation Area
An alternative method of moving the Transfer Cask to the Preparation Area adjacent to the loading pool.
Removing water from the Canister (DCS)
The process of removing water from the Dry Storage Canister.
Removing remaining moisture from the Canister (DCS)
A vacuum is pulled on the Canister to remove remaining moisture.
Canister (DCS) is backfilled with Helium
The Canister is backfilled with Helium which prevents corrosion and promotes heat transfer.
Alternative Method - Remove water, dry, and fill the Canister with Helium
An alternative method to remove the water, dry, and fill the canister with helium in the Preparation Area adjacent to the Spent Fuel Pool.
Sealing the Dry Storage Canister.
Sealing the Dry Storage Canister using remote welding.
Alternative Method - Sealing the Dry Storage Canister.
Alternative method for sealing the Dry Storage Canister using remote welding in the external Preparation Area.
Placing the Transfer Cask on truck.
Placing the Transfer Cask on the truck in the truck bay of the fuel handling building.
Truck exiting the Fuel Handling Building
Truck loaded with the Transfer Cask exits the Fuel Handling Building.
Transfer Cask being transported to the Dry Storage Building
The Transfer Cask exits the Fuel Handling Building on its way to the Dry Storage Building.
Alternative Method - Transfer Cask is being loaded horizontally on truck
The Transfer Cask is being loaded horizontally on truck from the external Preparation Area.
Alternative Method - Transfer Cask is being loaded vertically on transporter
The Transfer Cask is being loaded vertically from the external Preparation Area.
Alternative Method - Transfer Cask is being transported vertically
The Transfer Cask is being transported vertically to the Dry Storage Building.
Transporting the Transfer Cask through security gates
Transporting the Transfer Cask horizontally through the plant's security gates.
Transporting the Transfer Cask to the Dry Storage Building
The Transfer Cask continues traveling to the Dry Storage Building.
Alternative Method - Transporting the Transfer Cask
Transporting the Transfer Cask from the external Preperation Area.
Alternative Method - Transporting the Transfer Cask vertically
Transporting the Transfer Cask from the external Preperation Area vertically.
Alternative Method - Placing Transfer Cask at the Dry Storage Area
Placing the Transfer Cask in the vertical position at the Dry Storage Area.
Transfer Cask arrives at the Dry Storage Building and unloads
The Transfer Cask arrives at the Dry Storage Building and the Canister is moved into the Horizontal Storage Module.
Dry Storage Container being installed in the Horizontal Storage Module
Canister is installed in the Horizontal Storage Module.
{1}
##LOC[OK]##
{1}
##LOC[OK]##
##LOC[Cancel]##
{1}
##LOC[OK]##
##LOC[Cancel]##
Copyright (c) 2010 Nuclear Street
Advertise With Us
|
Terms and Conditions
|
Privacy
|
Copyright
|
Contact Us