Reactor: BWR
Location: Chin Shan, Taipei, Taiwan
In the News: Chinshan
1978 Unit 1 started commercial operation
1979 Unit 2 started commercial operation
1989 Upgrades were performed when Alstom provided a fabric filter for the low-radioactive-waste incinerator
2005 GE Energy upgraded monitoring and control systems
2008 Areva is providing the new fuel assemblies and will provide core monitoring system assistance in addition to the fabrication service, reload fuel design, licensing analysis, and operation support