Reactor: BWR
Location: Leibstadt (canton Aargau, Switzerland) on the Rhine River close of the Aare delta and the German border
In the News: Leibstadt
1964 Planning for the project began, With the prohibition of the river water cooling by the Swiss Federal Council a cooling tower solution was favored
1984 Plant started after an eleven-year construction period
2014 Plant scheduled to be shut down