Trillo
Reactor: PWR
Location: Guadalajara, on the banks of the river Tajo
In the News: Trillo
1988 Construction started on Unit 1 and commissioned for commercial use
1994 The licensee initiated a far-reaching design review programme known as the Operating Experience and Systems Analysis (OESA), with technical support from the main supplier, SIEMENS-KWU, and other engineering companies
2004 Within the framework of the programme to address severe accidents (with core damage), the Council reported favourably on the licensee’s proposal not to carry out the design modification of the containment filtered venting system that had been implemented at various European nuclear power plants, this modification not having been performed at the other Spanish plants or in the USA
2008 After evaluating the cost-benefit analysis carried out by Trillo NPP, the CSN required the licensee to submit the project for the installation of the design modification for a “bleed and feed” system aimed at improving the plant safety levels within nine months
2009 Trillo has submitted to CSN a project for the installation of a “bleed and feed” system that is currently under evaluation