Nuclear Street - Nuclear Power Plant News, Jobs, and Careers

  • Site
  • User
  • Site
  • Search Nuclear Street
  • User
  • Home
  • Buyers Guide
  • Marketplace
  • Jobs
  • Forums
  • Nuclear News
  • Support
  • More
  • Cancel
  • -New Nuclear Power Plants Worldwide
    • +Argentina
    • +Bulgaria
    • +China
    • +Finland
    • +France
    • +India
    • +Iran
    • +Japan
    • +Pakistan
    • +Russia
    • +Slovak Republic
    • +South Korea
    • +Taiwan
    • +Ukraine
    • -USA
      • Bell Bend Unit 1
      • Bellefonte Units 3 & 4
      • Blue Castle Project
      • Callaway Unit 2
      • Calvert Cliffs Unit 3
      • Comanche Peak
      • Fermi Unit 3
      • Grand Gulf Unit 3
      • Harris Units 2 & 3
      • Levy County Units 1 & 2
      • Nine Mile Point Unit 3
      • North Anna Unit 3
      • PSEG Site ESP
      • River Bend Unit 3
      • South Texas Project Units 3 & 4
      • Turkey Point Units 6 & 7
      • TVA Clinch River
      • Victoria County Units 1 & 2
      • Virgil C Summer Units 2 & 3
      • Vogtle Units 3 & 4
      • William Lee Nuclear Station Units 1 & 2
  • +Fukushima - Nuclear Power Plant
  • +Nuclear Power Plants Worldwide
  • +Nuclear Power Videos
  • +Reactors
  • +Reference
  • What to read about nuclear energy?
Related Content
Recommended Content

TVA Clinch River

TVA Clinch River

Licensing Status:       Pre-Application

Site:                           Clinch River in Roane County, Tennessee

Reactor:                     Babcock & Wilcox mPower Integral Pressurized-Water Reactor (iPWR)

Projected Online:       2012

In the News:              TVA Clinch River

NRC Application Review Schedule

Date

Description

03/23/11

TVA Voluntary Response to NRC Regulatory Issue Summary 2011-02, "Licensing Submittal Information and Design Development Activities for Small Modular Reactor Designs."

01/31/11

Letter from NRC Michael R. Johnson, Director, Office of New Reactors, to TVA, Staff Response to the TVA Key Assumptions Letters For the Possible Licensing and Construction of SMR modules at the Clinch River Site.

12/30/10

TVA Voluntary Response to NRC Regulatory Issue Summary 2010-01, "Process for Scheduling Acceptance Reviews of New Reactor Licensing Applications for Determining Budget Needs for Fiscal Year 2012."

12/22/10

Tennessee Valley Authority - Addendum to the Key Assumptions Letter for the Possible Licensing and Construction of Small Modular Reactor Modules at the Clinch River Site.

12/14/10

Clinch River SMR - Key Assumptions Slides from 12/14/2010 Public Meeting with TVA.

12/01/10

Letter from NRC Michael E. Mayfield, Director, Division of Advanced Reactors, to TVA, NRC Staff Questions Related to TVA Key Assumptions Letter, Dated November 5, 2010.

11/05/10

Tennessee Valley Authority - Key Assumptions Letter for the Possible Licensing and Construction of Small Modular Reactor Modules at the Clinch River Site.


Additional information can be found at http://www.nrc.gov/reactors/advanced/clinch-river.html

  • tva clinch river
  • mPower
  • Babcock & Wilcox
  • Share
  • History
  • More
  • Cancel

Advertise With Us | Terms and Conditions | Privacy | Copyright | Contact Us

Other Energy Markets: Renewable Energy Street (Coming Soon!)| Oil and Gas Street (Coming Soon!)
Copyright (c) 2023 NuclearStreet.com - A Media X Group Digital Property