TVA Clinch River
Licensing Status: Pre-Application
Site: Clinch River in Roane County, Tennessee
Reactor: Babcock & Wilcox mPower Integral Pressurized-Water Reactor (iPWR)
Projected Online: 2012
In the News: TVA Clinch River
NRC Application Review Schedule
Date
Description
03/23/11
TVA Voluntary Response to NRC Regulatory Issue Summary 2011-02, "Licensing Submittal Information and Design Development Activities for Small Modular Reactor Designs."
01/31/11
Letter from NRC Michael R. Johnson, Director, Office of New Reactors, to TVA, Staff Response to the TVA Key Assumptions Letters For the Possible Licensing and Construction of SMR modules at the Clinch River Site.
12/30/10
TVA Voluntary Response to NRC Regulatory Issue Summary 2010-01, "Process for Scheduling Acceptance Reviews of New Reactor Licensing Applications for Determining Budget Needs for Fiscal Year 2012."
12/22/10
Tennessee Valley Authority - Addendum to the Key Assumptions Letter for the Possible Licensing and Construction of Small Modular Reactor Modules at the Clinch River Site.
12/14/10
Clinch River SMR - Key Assumptions Slides from 12/14/2010 Public Meeting with TVA.
12/01/10
Letter from NRC Michael E. Mayfield, Director, Division of Advanced Reactors, to TVA, NRC Staff Questions Related to TVA Key Assumptions Letter, Dated November 5, 2010.
11/05/10
Tennessee Valley Authority - Key Assumptions Letter for the Possible Licensing and Construction of Small Modular Reactor Modules at the Clinch River Site.
Additional information can be found at http://www.nrc.gov/reactors/advanced/clinch-river.html